Factory-direct steel gratings & stair treads, shipped worldwide

Grating Supplier

Work direct with the factory. Flexible scheduling, fast answers on steel grating supplier.

One mill, one point of contact · FOB Tianjin, shipped worldwide

Rectangular galvanized welded grating panel; three-quarter view on white background
Rectangular galvanized welded grating panel

Factory-direct, no middlemen

The workshop that quotes your job runs it

Certified & tested

Reports on request · MTC EN 10204 3.1 with every order

Samples in 5–7 days

Production in 15–25 working days

FOB Tianjin

Mill about 400 km from port, shipped worldwide

Supply scope

What One Grating Supplier Should Cover

A supplier is more than a price on a panel. When buyers shortlist metal bar grating suppliers, they are really comparing the same six things this page measures — and this is how a factory-direct mill, a trading company and a local stockist compare on the six things a grating program actually depends on, with an honest note on where each model fits.

Dimension Factory-Direct Supplier Trading Company Local Stockist
Who makes your panelsThe same workshop that quotes — Dengtai Staircase Manufacturing Co., Ltd.A mill you rarely meet; the contract sits with the brokerWhatever mill filled the warehouse
Range across the catalogFour product lines, custom fabrication, and companion fixings sourced alongside panelsBroad on paper; depends on partner mills that weekStandard catalog sizes only
Custom sizesCut and banded to your drawings, free review inside the quotePossible, with an extra margin layerRarely offered
DocumentationMTC EN 10204 3.1, inspection report and DoC per destination with every orderVaries with the mill behind the orderRarely traceable to the heat
Lead timesSamples 5–7 working days, production 15–25 after drawing confirmationMill time plus broker handlingBound to warehouse stock
Reorder consistencySame lines, same five-stage QC, same MTC discipline on every repeatSpec can drift if the broker switches millsA reorder can mean a new source

Not sure which supply model fits your program? Send your drawings — we will spec it inside the 24-hour quote.

The supply path

From Drawing to Container

1 · Drawing & spec review

Send drawings, photos or a sketch. Review is free, and an itemized quote follows within 24 hours — from the workshop that will run the job.

2 · Samples in 5–7 days

Working days, hot-dip galvanizing included — prove the spec, the packing and the paperwork on a small trial order before you scale.

3 · Production in 15–25 days

Working days after drawing confirmation, under five-stage QC — from MTC verification at goods-in to final inspection before release.

4 · Packing & export

Export packing on steel straps and pallets, FOB Tianjin from a mill about 400 km from the port. DoC, MTC and inspection report travel with the shipment.

Why buyers stay

Why Buyers Make Dengtai Their Grating Supplier

One-stop across the range

Welded, press-locked, stair tread and stainless lines, custom fabrication to drawings, and companion clips and fixings sourced alongside our panels — one purchase order, one container, one supplier to hold to it.

No middlemen, export-ready

Factory-direct FOB quotes come from the workshop that runs your job. Export documentation is prepared per destination before the container is sealed — not patched together after sailing.

Quick replies, flexible scheduling

A small team that answers fast: quotes within 24 hours, small trial orders welcome, and scheduling that bends around your program instead of the other way around.

Specification evidence

The Same Spec, Every Reorder

ParameterRange held on file
Bearing bar20×3 mm to 100×8 mm, plain or serrated
Bar spacing30 / 40 / 60 mm centers
Panel widthUp to 1.25 m
Panel lengthUp to 6 m
MaterialsQ235B carbon steel · SS304 / SS316 stainless
SurfaceBlack or hot-dip galvanized (ASTM A123 / ISO 1461)
Stock designation19W4 and custom equivalents

Documents that travel with every order

Repeat supply is where a supplier is really chosen. Your drawing stays on file, and every reorder leaves the mill with the same documentation package — no renegotiating the paper trail each time:

  • Mill test certificate to EN 10204 Type 3.1
  • Factory inspection report with every shipment
  • Declaration of Conformity prepared per order destination

Load tables & calculators → · Audit the workshop →

Standards & compliance

Produced to Recognized Standards — Documents on Request

ANSI / NAAMM MBG 531

Welded panels produced to MBG 531 reference practice, with weld inspection built into our five-stage QC plan.

ASTM A123 / ISO 1461 HDG

Galvanized coating thickness checked by sampling on every galvanized batch before panels are released for export.

CE & SGS tested

Certified & tested, reports on request — we show documents you can verify, not a certificate wall.

Standards hub — market-by-market comparison →

Repeat supply

One Point of Contact, From Drawing to Container

1

Send your drawing, or just a spec

Panel sizes, loads, quantities — or photos and a sketch. Drawing review is free, and the answer comes from the same person who follows the order.

2

Quote within 24 hours

Itemized, FOB Tianjin as standard — EXW or CIF negotiable. Small trial orders welcome, so the first container does not have to be the biggest one.

3

Reorder the same spec

Your drawing and mill test certificates stay on file — same lines, same five-stage QC, same documentation. Installation drawings and fixing layout ship with the order.

More about custom fabrication →

Worker welding steel grating with sparks visible
Worker welding steel grating with sparks visible

Factory-direct quote

Vet Us as Your Grating Supplier

Send panel sizes and quantities — an itemized quote lands within 24 hours, and samples follow in 5–7 days. That is the whole vetting process.

  • Five-stage QC, from MTC verification at goods-in to final inspection
  • DoC, MTC EN 10204 3.1 and inspection report with every order
  • Factory audits welcome — see the lines before you commit

Prefer to talk? WhatsApp us or sales@dtsteelladder.com

Request your quote

Five fields — we do the rest.

By submitting you agree to our privacy policy. No spam, no resale of your data.

FAQ

Frequently Asked Questions

Can I test the supply with samples first?

Yes — small trial orders are welcome, and samples ship in 5–7 working days with hot-dip galvanizing included. Production runs 15–25 working days after drawing confirmation, so you can prove the spec before you scale.

How do reorders stay consistent?

Your drawing and mill test certificates stay on file, and every repeat order runs through the same lines, the same five-stage QC and the same MTC EN 10204 3.1 discipline. Installation drawings and fixing layout ship with each order.

What are the supply and shipping terms?

FOB Tianjin as standard — our mill sits about 400 km from the port — with EXW or CIF negotiable. Quotes are itemized within 24 hours; we do not publish a fixed price list. DoC, MTC and the factory inspection report travel with every shipment.

All buying & technical FAQs →