Factory-direct steel gratings & stair treads, shipped worldwide

Catwalk Metal Grating

Safe, non-slip catwalk metal grating for daily plant traffic, from one factory.

Q235B+HDG · SS304 · SS316 · Black for site coating — itemized quote within 24 hours

Wide shot of grating catwalk systems inside water treatment plant
Wide shot of grating catwalk systems inside water treatment plant

Four product lines in-house

Welded, press-locked, treads and stainless grating

Certified & tested

Reports on request, MTC EN 10204 3.1 every order

Samples in 5–7 days

Production in 15–25 working days

FOB Tianjin

Mill ~400 km from port, shipped worldwide

Metal options by environment

Q235B, SS304 or SS316 — Match the Metal to the Plant

Most catwalk failures are metal-selection failures, not grating failures. Pick the grade for what the air and floor wash over your walkway — every option below runs on our own lines, hot-dip galvanizing included.

Catwalk environment Recommended metal Surface Why it lasts
Outdoor plant catwalks — rain, sun, frostQ235B carbon steelDefaultHot-dip galvanized, ASTM A123 / ISO 1461The workhorse spec — zinc coating stands up to weather, thickness checked by sampling on every galvanized batch
Food, beverage and pharmaceutical washdownSS304 stainless steelBare stainless — nothing to chip or re-coatShrugs off daily hosing and cleaning chemicals; no coating to scratch off under boot traffic
Chemical plants, coastal and salt-laden sitesSS316 stainless steelBare stainless — no coatingThe molybdenum-bearing grade for chlorides, salt spray and acidic spill zones that consume zinc
Indoor dry access, plants with one site paint systemQ235B black (uncoated)Prepared for your site-applied coatingShips bare so your maintenance crew paints it with the same system as the surrounding steelwork

Mixed exposure, or unsure which metal your plant needs? Send your drawings — we will spec it inside the 24-hour quote, environment by environment.

How catwalk metal becomes a panel

From Mill-Certified Steel to Finished Catwalk Panel

flat bars in MTC verified per heat

1 · Mill-certified metal in

Q235B, SS304 or SS316 arrives with its mill test certificate — EN 10204 Type 3.1 — verified at goods-in. The first of five QC stages, before a single bar is cut.

bearing bars welded or press-locked

2 · Panels formed in-house

Bearing bars and cross bars become one panel on our electro-forging line, or press-locked for close mesh down to 11 / 11 mm — plain or serrated surface for your steel grate catwalk.

panel HDG bath — or ships black / bare stainless

3 · Finish and documents

Carbon steel panels go to our certified galvanizing partner — typically 2–3 days, already inside your production window. Stainless ships bare; black ships for your site coating. Either way, MTC and inspection report travel with the order.

Why specify catwalk metal from us

Why Plants Order Catwalk Metal Grating From One Factory

Safe, load-rated for daily traffic

Anti-slip steel grate catwalk surfaces — serrated or plain — on panels sized for your spans, not guessed. Open mesh sheds water and debris, so the walking line stays visible.

The right metal, built to last

Galvanized steel grate catwalk panels outdoors, SS304 or SS316 through corrosive plants, black steel where your paint system takes over — one supplier, one spec sheet, one warranty conversation.

Custom sizes, factory-direct

Catwalk metal made to size from your drawings — buy in bulk or start with a small trial order. Factory-direct FOB pricing from one mill, with test data per batch.

Applications

Where a Steel Grate Catwalk Earns Its Keep

Elevated access built from grating instead of plate: lighter structure, no water pooling, and a walking surface you can see is safe. Four typical duties we quote every week.

Elevated plant catwalks

Q235B+HDG panels over process lines — the default outdoor metal, rain or frost.

Washdown-area access

SS304 walkways around food and beverage equipment — hosed daily, never re-coated.

Mezzanine walkways

Press-locked close mesh where small parts must not fall through the floor.

Conveyor & pipe-rack access

Black catwalk steel grating that disappears into the plant paint system on day one.

Explore all application pages →

Specifications

Catwalk Metal Grating Specifications

ParameterRange
Bearing bar20×3 mm to 100×8 mm, plain or serrated
Bar spacing30 / 40 / 60 mm centers
Cross barTwisted square or round, per specification
Panel widthUp to 1.25 m
Panel lengthUp to 6 m
MetalsQ235B carbon steel · SS304 / SS316 stainless
SurfaceBlack or hot-dip galvanized (ASTM A123 / ISO 1461)
Close meshDown to 11 / 11 mm on the press-locked line

Metals & test documents

Every heat of Q235B, SS304 or SS316 enters production with its mill test certificate verified at goods-in — the first of our five QC stages. Catwalk panels leave with documentation, not promises:

  • Mill test certificate to EN 10204 Type 3.1
  • Factory inspection report with every shipment
  • Declaration of Conformity prepared per order destination

Stainless steel options → · Q235 line → · Galvanized line →

Standards & compliance

Produced to Recognized Standards — Documents on Request

ANSI / NAAMM MBG 531

Catwalk panels produced to MBG 531 reference practice, with joint inspection on our five-stage QC plan.

ASTM A123 / ISO 1461 HDG

Galvanized coating thickness checked by sampling on every galvanized batch before catwalk panels are released.

CE & SGS tested

Certified & tested, reports on request — we show documents you can verify, not a certificate wall.

Standards hub — market-by-market comparison →

Custom made

Custom Catwalk Steel Grating, Cut and Banded to Your Drawings

1

Send your drawing

Panel sizes, walkway runs, load specs, quantities — or just photos and a sketch. Drawing review is free.

2

Quote within 24 hours

Itemized, FOB Tianjin as standard — EXW or CIF on request. Small trial orders welcome.

3

Samples in 5–7 days, production in 15–25

Working days after drawing confirmation, hot-dip galvanizing included. Installation drawings and fixing layout ship with the order.

More about custom fabrication →

Steel structure tower with grating stairs and platforms at industrial plant
Steel structure tower with grating stairs and platforms at industrial plant

Factory-direct quote

Get a Catwalk Metal Grating Quote

Tell us the environment and the spans — an itemized quote lands within 24 hours, free drawing review included.

  • Five-stage QC, from MTC verification at goods-in to final inspection
  • DoC, MTC EN 10204 3.1 and inspection report with every order
  • Factory audits welcome — see the lines before you commit

Prefer to talk? WhatsApp us or sales@dtsteelladder.com

Request your quote

Five fields — we do the rest.

By submitting you agree to our privacy policy. No spam, no resale of your data.

FAQ

Frequently Asked Questions

Which metal is best for an outdoor catwalk?

Q235B carbon steel with hot-dip galvanizing to ASTM A123 / ISO 1461 is the default choice for outdoor catwalks — coating thickness is checked by sampling on every galvanized batch. Move up to SS304 for washdown areas, or SS316 where chlorides and coastal salt are present.

What is the lead time for catwalk metal grating?

Samples ship in 5–7 working days and mass production runs 15–25 working days after drawing confirmation, hot-dip galvanizing included. Rush production in 10–15 days is possible with a surcharge — ask in your quote.

Can catwalk grating be supplied black instead of galvanized?

Yes — black (uncoated) Q235B panels ship ready for your site-applied coating system, which many plants standardize on. Bare SS304 and SS316 stainless need no coating at all. State your surface preference in the quote request and we confirm it in writing.

All buying & technical FAQs →